Skip to page content
USDA Forest Service
  
Treesearch

Research & Development Treesearch

 
Treesearch Home
About Treesearch
Contact Us
Research & Development
Forest Products Lab
International Institute of Tropical Forestry
Northern
Pacific Northwest
Pacific Southwest
Rocky Mountain
Southern Research Station
Help
 

Science.gov - We Participate


USA.gov  Government Made Easy


Global Forest Information Service

US Forest Service
P.O. Box 96090
Washington, D.C.
20090-6090

(202) 205-8333

You are here: Home / Search / Publication Information
Bookmark and Share

Publication Information

View PDF (9.0 MB bytes)

Title: Live-load performance evaluation of historic covered timber bridges in the United States

Author: Seo, Junwon; Hosteng, Travis K.; Phares, Brent M.; Wacker, James P.;

Date: 2015

Source: Journal of Performance of Constructed Facilities, 2016, 30(4).

Publication Series: Scientific Journal (JRNL)

Description: The National Historic Covered Bridge Preservation Program (NHCBP), sponsored by the Federal Highway Administration (FHWA), was established to preserve the covered timber bridge structures that were constructed in the early 1800s. Today, many of the approximately 880 covered timber bridges still in existence in the United States are closed to vehicular traffic; furthermore, a large percentage of the remaining bridges open to traffic are restricted by load postings. Unfortunately, there are no current load-rating standards for covered timber bridges, so engineers do not have many resources at their disposal to reliably understand the behavior of these complex structures. As a result, the estimated load postings and/or ratings are often too conservative. To better understand the live-load performance of covered timber bridges and to develop improved criteria for their load ratings, a series of live-load tests were performed on 11 single-span, historic covered timber bridges. This paper explains the field testing conducted on all of the bridges, and makes recommendations for the conduct of other similar tests. The tests consisted of installing a network of multiple displacement and strain sensors on the structures, and monitoring global displacements and member strains at various cross sections during passage of a known test. The vehicle used in the testing met the load restrictions in place at the time of testing. The results of this work serve as a basis for instrumentation and field testing, to investigate the liveload performance on such bridges. This paper outlines the field-testing methods and summarizes the results from the testing of all 11 bridges. Based on the field-testing methods, a field-testing protocol is recommended for the live-load testing of historic covered timber bridges. Feasibility of the recommended protocol is also evaluated using a finite-element model analysis for a selected bridge among the tested bridges.

Keywords: Field testing, Live-load performance, Timber, Covered bridges, Burr arch truss, Howe truss, Queen post truss

Publication Notes:

  • We recommend that you also print this page and attach it to the printout of the article, to retain the full citation information.
  • This article was written and prepared by U.S. Government employees on official time, and is therefore in the public domain.

XML: View XML

Citation:


Seo, Junwon; Hosteng, Travis K.; Phares, Brent M.; Wacker, James P. 2015. Live-load performance evaluation of historic covered timber bridges in the United States. Journal of Performance of Constructed Facilities. 30(4): 04015094-1 - 13.

 


 [ Get Acrobat ]  Get the latest version of the Adobe Acrobat reader or Acrobat Reader for Windows with Search and Accessibility

USDA logo which links to the department's national site. Forest Service logo which links to the agency's national site.