Skip to page content
USDA Forest Service
  
Treesearch

Research & Development Treesearch

 
Treesearch Home
About Treesearch
Contact Us
Research & Development
Forest Products Lab
International Institute of Tropical Forestry
Northern
Pacific Northwest
Pacific Southwest
Rocky Mountain
Southern Research Station
Help
 

Science.gov - We Participate


USA.gov  Government Made Easy


Global Forest Information Service

US Forest Service
P.O. Box 96090
Washington, D.C.
20090-6090

(202) 205-8333

You are here: Home / Search / Publication Information
Bookmark and Share

Publication Information

View PDF (1.8 MB bytes)

Title: Field performance of timber bridges. 4, Graves Crossing stress-laminated deck bridge

Author: Wacker, J. P.; Ritter, M. A.;

Date:

Source: (Research paper FPL ; RP-539):17 p. : ill., maps ; 28 cm.

Publication Series: Research Paper (RP)

Description: The Graves Crossing bridge was constructed October 1991 in Antrim County, Michigan, as part of the demonstration timber bridge program sponsored by the USDA Forest Service. The bridge is a two-span continuous, stress-laminated deck superstructure and it is 36-ft long and 26-ft wide. The bridge is one of the first stress-laminated deck bridges to be built of sawn lumber treated with chromated copper arsenate (CCA) preservative. The performance of the bridge was continuously monitored for 2 years, beginning at the time of installation. This performance monitoring involved gathering and evaluating data relative to the stiffness of the lumber laminations, the moisture content of the wood deck, the force level in the stressing bars, and the behavior of the bridge under static truck loading. In addition, comprehensive visual inspections were conducted to assess the overall condition of the structure. Based on 2 years of field observations, the bridge is performing well with no structural or serviceability deficiencies.

Keywords: Bridges, Structural timbers, Laminated wood, Stress analysis, Michigan

Publication Notes:

  • We recommend that you also print this page and attach it to the printout of the article, to retain the full citation information.
  • This article was written and prepared by U.S. Government employees on official time, and is therefore in the public domain.

XML: View XML

Citation:


Wacker, J. P.; Ritter, M. A. Field performance of timber bridges. 4, Graves Crossing stress-laminated deck bridge. (Research paper FPL ; RP-539):17 p. : ill., maps ; 28 cm.

 


 [ Get Acrobat ]  Get the latest version of the Adobe Acrobat reader or Acrobat Reader for Windows with Search and Accessibility

USDA logo which links to the department's national site. Forest Service logo which links to the agency's national site.